Skip to content

Based in Collin County, TX

Kitchen Remodeling

Cabinets, countertops, backsplash and flooring for kitchen updates and full remodels.

Typical range$30,000 to $40,000

New cabinets, quartz counters, full-height backsplash and LVP, layout stays. Counters alone are a fraction of that.

Kitchens in Collin County subdivisions tend to follow a pattern: raised-panel oak or maple cabinets, laminate or tile counters, a 4 inch backsplash and a tile floor that runs into the breakfast nook. Buyers in 2026 want painted or replaced cabinets, quartz counters, a full-height backsplash and a floor that matches the rest of the house.

We handle the whole sequence, from demo through final paint, and coordinate the trades so you are not managing a plumber, an electrician and a countertop fabricator on your own.

What is included

  • Cabinet replacement, refacing or professional painting
  • Quartz, granite and solid-surface countertops with sink cutouts
  • Tile and slab backsplashes, standard or full height
  • Sink, faucet, disposal and dishwasher installation
  • Under-cabinet lighting and outlet additions
  • Flooring tie-ins to adjacent rooms

What we look for in Collin County homes

  • Many 1990s and 2000s kitchens have a soffit above the uppers. Removing it to run cabinets to the ceiling is popular, but we check for ductwork and wiring first.
  • Removing a wall between the kitchen and living area is common in these floor plans. Some of those walls are load-bearing, so we treat any wall removal as a site-visit item.
  • Tile over slab is typical. If the existing floor is well bonded, a floating LVP can sometimes go over it without a full demo.

Ranges are typical, not quotes. Every written estimate shows a range of about 8 percent under to 12 percent over the point estimate, and the final number is confirmed on site.

Local guides

Kitchen Remodeling, city by city

Before you ask

Straight answers

Can I replace just the countertops?

Yes. Countertop-only jobs are a good fit for photo-based estimating as long as the cabinets are level and sound. We need a photo of each run with a tape measure.

Paint or replace the cabinets?

If the boxes are solid and you like the layout, a professional spray finish costs a fraction of replacement. If doors are warped or the layout does not work, replacement is the better long-term choice.

How long is a kitchen remodel?

A cosmetic update (paint, counters, backsplash) is typically two to three weeks. A full remodel with new cabinets is four to eight weeks depending on cabinet lead times.

Will I be without a kitchen the whole time?

Plan on it for a full remodel. We set up a temporary prep area and keep the water on wherever possible.

Get started

Send a few photos of the kitchen remodeling and we will put a range in writing.

Mon to Fri
8:00-18:00
Saturday
9:00-14:00
Sunday
closed
Reply time
Within one business day