Bathroom Remodeling

Tile, showers, vanities and full bathroom remodels for Collin County homes.

Typical range$12,000 to $16,000

Hall bath, mid-range finishes, layout stays. Primary baths with custom tile showers run higher.

Most bathrooms in Allen, Plano, McKinney and Frisco were built between the early 1990s and the late 2010s, which means builder-grade tub surrounds, cultured marble vanity tops and a shower pan that is reaching the end of its life. A remodel usually means removing all of that down to the studs, fixing anything the demo uncovers, and rebuilding with materials that will last.

We price bathroom work from photos first. You send us wide shots, the shower, the vanity wall and one photo with a tape measure, and we come back with a written preliminary range. If the layout is changing or we see signs of water damage, we schedule a site visit before anything is final.

What is included

  • Full demo and haul-away of the old tub, tile and vanity
  • Shower pan, waterproofing and tile on floors and walls
  • Vanity, toilet, mirror and light fixture installation
  • Shower valve replacement and exhaust fan upgrades
  • Drywall patching, texture matching and paint
  • Tub-to-shower conversions where the framing allows

What we look for in Collin County homes

  • Slab foundations are standard here. Moving a toilet or shower drain means cutting concrete, so we flag any layout change as a site-visit item up front.
  • Hall baths in 1990s and 2000s builds often share a wet wall with a second bath. We check both sides before opening anything.
  • Exhaust fans are frequently undersized for North Texas humidity. We recommend a properly rated fan vented to the exterior, not the attic.

Ranges are typical, not quotes. Every written estimate shows a range of about 8 percent under to 12 percent over the point estimate, and the final number is confirmed on site.

Local guides

Bathroom Remodeling, city by city

Before you ask

Straight answers

How long does a bathroom remodel take?

A hall bath with no layout change typically runs two to three weeks once materials are on site. Primary baths with custom tile showers run longer. We give you a schedule with the estimate.

Can you keep the toilet and vanity where they are?

Yes, and it keeps the price down. On slab foundations, relocating drains means cutting concrete, which is the single biggest cost driver in a bathroom.

Do I need a permit for a bathroom remodel?

Cosmetic work like tile, vanities and paint usually does not. Moving plumbing or electrical typically does. We tell you which category your job falls into with the estimate.

What should I photograph for a bathroom estimate?

The whole room from the doorway, the shower or tub straight on, the vanity wall, the toilet wall and one shot with a tape measure along the longest wall. Under-sink and ceiling shots help too.

Get started

Send a few photos of the bathroom remodeling and we will put a range in writing.